Description

Construction of the New Terminal (No. 3) at Cairo International Airport. The Project consists of:

  • 343 linear meters of steel moulds which are used to execute 9,900 structural pre-cast beams.
  • Pre-cast beams which are installed to form 5 floors of the Airport with a total area of 100,000 m2.
  • 13 tower cranes, 5 mobile cranes and 2 gantry cranes which are used to produce and install pre-cast units.